slabtec- Bondi Junction Meriton

Meriton Suites Bondi Junction

DESCRIPTION

Slabtec were engaged in strengthening the slab due to large penetrations being installed in multiple locations due to further construction proceeding on an existing structure.

Slabtec worked with both ABC Consultants and Meriton to install CFRP strips to multiple areas of the job and truncate all affected post-tensioned tendons before any cutting occurred.

Meriton

N/A

ABC Consultants

  • Sika Carbodur S
  • Megapoxy systems